Construction of a pilot plant with 3 heat exchangers

Test: duration 100 days

2 heat exchangers were equipped with 

FR devices.

1 heat exchanger was installed without

PeterAqua Fr device assembled 

(raw Water)

The result is already after this

in short time

Structure of the simulated

consumer

                       Left result with                       

                       PeterAqua FR product,          

                       no limescale deposits           

                       Right result without

                       Peter Aqua FR Produkt,

                       strong limescale deposits

Close Menu